Helsingborg C Upper – New Platform for Passenger Exchange
Helsingborg Central Station is a high-traffic railway hub, which made it necessary to construct a new platform for passenger trains. The purpose of the expansion at Helsingborg C Upper was to increase capacity, manage future traffic growth, and accommodate the rising number of passengers.
This measure was crucial for ensuring smooth traffic flow and improving the station’s functionality.
Project details
Location
Sweden
Client
Trafikverket
Type of contract
Main contract
Status
Completed
Duration
2023 – 2024
Project Facts
260-meter-long platform
New signalling system
New fire alarm system
30-meter cast-in-place staircase
Project Summary
The project involved:
- Demolition of the existing platform and track
- Construction of a new train platform with a platform roof
- Installation of a cast-in-place staircase connecting the platform to Tingsrättsbron
- Installation of two cast-in-place buffer stops
- Sleeper replacements on tracks 5–8
The contract included M-BEST works as well as civil and structural works involving concrete, steel, and wood.
The railway works comprised:
- Removal of track switches
- Construction of track spans
- Replacement of sleepers
- Installation of a new signaling system
- Reconstruction and new construction of overhead lines
- Implementation of remote control systems
- Low-voltage work, including new lighting and an integrated fire alarm system
Logistics
The logistics of the project posed a significant challenge, particularly due to:
- Extensive demolition
- Construction of track spans and platforms
A well-planned strategy ensured that the work progressed smoothly with minimal impact on the surrounding environment.
Collaboration with Trafikverket
Strong collaboration with Trafikverket was a key factor in the project’s success. A shared focus on solutions enabled the team to overcome challenges effectively throughout the project.