Sävenäs Train Depot

Västra Götaland is a growing region, and Västtrafik aims to double the number of daily train journeys to 130,000 by 2035. To accommodate this growth and ensure sufficient capacity for increasing train traffic, a new train depot was required at Sävenäs.

Project details

Location

Sweden

Client

Skanska AB

Type of contract

Subcontract

Status

Completed

Duration

2022 – 2024

Project Facts

800 meters of new track

8 new track switches

Construction of a new train depot

Design and Construction

The project involved the design and construction of a new railway facility within the client’s expanded site, both inside and outside the newly built depot.

This included:

  • Expanding the existing train depot for Jernhusen
  • Developing new railway infrastructure
  • Upgrading existing tracks

As part of this contract, we were responsible for all ​​BEST works, ensuring the seamless integration of the new and existing railway infrastructure.

We installed a total of 800 meters of new track, and eight track switches were strategically placed in newly designated locations to optimize functionality and efficiency. 