New Brigde in Regstrup
Across Denmark, Aarsleff Rail is participating in a series of bridge rebuilds and replacements over railways. As part of the nationwide railway electrification, bridges with limited clearance for catenary systems are being either rebuilt or replaced.
Project details
Location
Denmark
Client
Banedanmark
Type of contract
Main contract
Status
Completed
Project period
2023–2024
Advisor
Rambøll A/S
Project Facts
305 m³ poured concrete
233 m² of sheet piling
10,253 m³ road embankments
Widening of access roads and road expansion, including safety barriers
Ready for Electrification and Higher Traffic Volumes
In Regstrup, southwest of Holbæk on the railway line between Holbæk and Kalundborg, Aarsleff Rail replaced an old, narrow bridge with a new, modern structure. The new bridge was constructed adjacent to the existing one on six concrete columns. Once the new bridge was operational, the old bridge was demolished.
All work on the bridge, associated track works, railway installations, and safety measures was carried out by Aarsleff Rail teams.