Norrköping Municipality

We take pride in our reference project in Norrköping, where we have been responsible for the operation and maintenance of the municipality’s light rail and siding tracks. This assignment has included everything from tracks and switches to overhead lines and signaling systems, requiring a broad range of measures to ensure a safe, efficient, and well-functioning infrastructure.

The light rail system is an essential part of public transportation in Norrköping, playing a central role in transporting thousands of passengers daily.

Project details

Location

Sweden

Client

Norrköping Municipality

Type of contract

Main contract 

Status

Completed

Duration

2003 – 2023

Project Facts

45.000 meters of light rail track

40.000 meters of siding tracks

Total project duration: 20 years

Operation and Maintenance

Over the years, we have carried out extensive operational and maintenance activities, including:

  • Regular infrastructure inspections
  • Snow removal during winter months
  • On-call preparedness for rapid issue resolution

Our work has focused on ensuring operational reliability and high quality, involving:

  • Continuous track inspections
  • Replacement of worn components
  • Preventive maintenance to extend infrastructure lifespan

Our collaboration with Norrköping Municipality has been highly successful, contributing to our shared goal of a safe and reliable track system. Together, we have:

  • Developed effective working methods and routines
  • Maintained the light rail network in excellent condition
  • Enhanced a key part of the city’s infrastructure and public transport system

Through our long-term involvement, we have gained valuable experience and expertise that we will bring to future projects, continuing to deliver sustainable and efficient rail infrastructure solutions.

Gallery