The Norwegian Ocean Technology Centre Area B – Groundwork
The ship model tank at NTNU is a key facility in the marine engineering research environment in Trondheim. In this project, we carried out the groundwork for constructing a new test pool for marine vessels. Once the building itself is completed, it will house a highly specialized professional environment.
Project details
Location
Norway
Client
Statsbygg
Type of contract
Turnkey contract
Status
Completed
Duration
June 2022 – June 2024
Project Facts
Excavation and blasting of approximately 300,000 m³ of soil and rock
Excavation down to 35 meters below terrain level in the center of the construction pit
Research Hub
Ocean Space Center Fløy B was a large-scale project that included extensive demolition and groundwork at the Ocean Research Laboratories of SINTEF and NTNU at Tyholt in Trondheim.
The site’s location placed strict requirements on noise reduction and logistics regarding mass transport from the construction site. The project also included the development of common infrastructure for the facility, including district heating, water, and sewage systems.