Sävenäs – Relocation of track 51

Sävenäs rail yard in Gothenburg is one of Sweden’s most important hubs for freight traffic and train shunting. To enable the expansion of Jernhusen AB’s depot capacity, a temporary relocation of track 51 and the service roadpassing through the depot area is required.

This measure is essential to maintain the rail yard’s functionality during the expansion phase. The temporary relocation will remain in place until 2025, when the final reconstruction of the yard is carried out, and track 51 is permanently relocated north of the depot building.

Project details

Location

Sweden

Client

Trafikverket

Type of contract

Main contract 

Status

Completed

Duration

2022 – 2024

Careful Planning of Logistics

The project requires carefully planned logistics, taking into account the ongoing operations within the rail yard. The relocation of the track and service road demands a well-coordinated effort to minimize disruptions and ensure that freight traffic continues to operate smoothly.

This temporary solution plays a key role in the preparations for the comprehensive reconstruction of Sävenäs rail yard. By implementing these measures:

  • Capacity and efficiency within the yard are improved
  • Future transport demands can be met more effectively
  • The railway network’s long-term sustainability is strengthened

Gallery