
Train Washing in Næstved
Clean trains are essential to passenger experience—and to help DSB maintain high standards, Aarsleff Rail has built a new washing facility for their electric passenger trains. The facility enables fast, efficient cleaning and servicing, ensuring trains are quickly ready to return to operation.
Project details
Location
Denmark
Client
DSB
Type of contract
Main contract
Status
Completed
Project period
April 2022 – July 2023
Project Facts
2.826 m of concrete piling size 35×35 cm
1.430 m3 in-situ concrete
3.350 m2 precast concrete elements
700 m drainage
Washing and Train Servicing Facility
We constructed a building to house the washing equipment, including a pumping system and water treatment facilities, along with the necessary track and catenary systems for train access. All work was carried out while nearby stabling tracks remained in operation. The project was completed and handed over in accordance with the contract terms.
Wide Range of Competencies
The main building of the washing complex is 90 metres long, built from precast concrete elements. It features slab track construction and a modern washing system, supported by an additional building housing offices, toilets, ventilation, and plant facilities.
Due to challenging ground conditions, we established a comprehensive pile foundation. The entire project was delivered by our own teams, covering earthworks, drainage, complex installations, track, and catenary works. In a neighbouring project, we also built new stabling tracks and train servicing facilities.